CAPE DEMOLITION CAPE TOWN · WESTERN CAPE

Get a Demolition Quote in Cape Town

Every demolition is quoted from a site visit rather than from a rate card, because access and attachment change the method rather than just the effort. The visit takes 30 to 45 minutes on a house. The written quote follows, itemised by strip depth, disposal route, salvage credit and exclusions.

Get a demolition quote

Free site visit and written quote anywhere in greater Cape Town. The questions below are the ones that actually change the price — access and the age of the building matter most.

Free site visit and written quote anywhere in greater Cape Town.

Call 064 582 1436Get a demolition quote

What helps before the visit

What happens at the site visit

  1. Structure type, storeys and construction assessed
  2. Access measured — the largest single cost factor
  3. Shared walls, boundaries and neighbouring structures checked
  4. Services located and their disconnection status established
  5. Roof covering and suspect materials checked, including possible asbestos
  6. Recoverable material identified and valued
  7. Heritage age question resolved or flagged for records research

What the written quote states

Quote line items.
ItemStated as
Strip depthAbove ground, to slab, or to footings
Permit applicationIncluded, with the waste management plan
Service disconnectionsCoordination, with authority timelines flagged
Demolition and load-outMethod and plant
DisposalBy stream, with named licensed facilities
Salvage creditA separate credit line
ReinstatementBackfill, compaction, grading
ExclusionsStated plainly, including asbestos removal

Asbestos removal is excluded from every quote. It is restricted by law to a registered asbestos contractor. Where asbestos is suspected the quote says so and flags the effect on programme. See asbestos on demolition sites.

Frequently asked questions

Is a demolition quote free?

Yes. The site visit and the written quote are free anywhere in greater Cape Town. The visit takes 30 to 45 minutes on a house, and the written quote follows itemised by strip depth, disposal route, salvage credit and exclusions.

Can you quote from photographs?

Photographs help and they do not replace the visit. Access is the largest single cost factor and it is measured rather than estimated, and shared walls, service positions and roof coverings need checking in person. A price given from photographs alone gets revised on arrival.

What should I have ready for the site visit?

The address, roughly when the structure was built, what you want removed, whether anything is being rebuilt, and anything you want to keep. The build date matters most, because a structure older than 60 years brings the heritage permit process into the programme.

How long does a quote take?

The written quote follows the site visit. Where the heritage age question needs municipal building plan records to resolve, the quote states the position as conditional on that check rather than waiting on it, so the rest of the programme can proceed.

What is not included in a demolition quote?

Asbestos removal is excluded from every quote, because it is restricted by law to a registered asbestos contractor. Rebuilding, construction and building plan approvals are separate. Exclusions are stated plainly on the quote rather than left to be discovered later.